The TotalSignals package was used to design and install a signal scheme for construction of the innercity section of the CrossRail Link in London. Within the busy streets of Southwark, South London, our design team came up with an efficient innovative design to enable contractors HGV’s to enter a site near... more
TotalSignals package has recently been used to improve the method of control of a traffic signal junction
With a full TR2500 design, Linsig model and IC4 configuration and factory test. Our team then started work on the site within 2 days of the testing being completed. Full traffic management and site safety was applied by us, whilst the push buttons and traffic islands were installed. more
Magnetometer. loops and resurfacing
TotalSIgnals package has been used to enable a client to have MOVA and SCOOT detector positions included during a night resurfacing project. Using the full design and build option, TotalSignals designed SCOOT and MOVA detector position more
TotalSignals has been used to design a MOVA method f operation including traffic modelling for improving a junction, whilst adding pedestrian facilities. Whilst the TR2500 specification was being written by our design studio, TotalSignals construction crew improved more
TotalSignals package is being used to enable an efficient design and build project within the ‘airside’ of T5 Heathrow Airport, London. Working together the design and build experts at more